Planning the design process starts
at the outset of any project and is initiated by
preparation of a quote document by the sales team to
the Clients User Requirement Specification.
All successful tenders are formally handed over where a
Project Manager and design team are appointed,
operations then proceed with the organisation, design
and manufacturing stage.
The Project Manager assesses the design and
manufacturing progress in relation to approved and
well-structured Design Plan Requirements.
ACE assures Clients requirements are adhered to,
checking for any anomalies and lack of clarity, they
keep close liaisons with client representatives.
Models are built as necessary to verify ergonomic
features of the product
Design output information and data is prepared in a
clear and comprehensive format and all drawings are
prepared on computer using AutoCAD.
ACE standard documentation is a mandatory requirement
and the format reads as follows:-
■ User
Requirement Specification
■ Project
Quality (Design) Plan
■
Certificate of Conformity
■ Functional
Design Specification
■ Factory
Acceptance Test
■ Site
Acceptance Test
■
Client Document Pack (if required)
■ Project
Change Note (if required)
When product build is complete,
the design is fully validated by Factory Acceptance
Tests and Site Acceptance Tests. Product O&M Manuals are
issued with products after validation.
All products for use in Europe are CE Marked and conform
to CE marking legislations. |