Applied Containment Engineering -  Documentation

Planning the design process starts at the outset of any project and is initiated by preparation of a quote document by the sales team to the Clients User Requirement Specification.

All successful tenders are formally handed over where a Project Manager and design team are appointed, operations then proceed with the organisation, design and manufacturing stage.

The Project Manager assesses the design and manufacturing progress in relation to approved and well-structured Design Plan Requirements.

ACE assures Clients requirements are adhered to, checking for any anomalies and lack of clarity, they keep close liaisons with client representatives.

Models are built as necessary to verify ergonomic features of the product

Design output information and data is prepared in a clear and comprehensive format and all drawings are prepared on computer using AutoCAD.

ACE standard documentation is a mandatory requirement and the format reads as follows:-

    User Requirement Specification
    Project Quality (Design) Plan
    Certificate of Conformity
    Functional Design Specification
    Factory Acceptance Test
    Site Acceptance Test
    Client Document Pack (if required)
    Project Change Note (if required)

When product build is complete, the design is fully validated by Factory Acceptance Tests and Site Acceptance Tests. Product O&M Manuals are issued with products after validation.

All products for use in Europe are CE Marked and conform to CE marking legislations.


Applied Containment Engineering -  Documentation
Project Handling by Applied Containment Engineering